Industry news — Recommended Inspection Schedule

Recommended Inspection Schedule

0%

Select Product

Select the amount of lift cycles per week

Recommended Inspection Schedule
EVERY 12 MONTHS

According to Australian Standards Chain Slings (G80 or G100) should be visually inspected by a competent person EVERY 12 MONTHS.
This is a guide only. Lifting Equipment should be inspected prior to each use to ensure it has a current inspection tag, has not been recently damage and is safe for use. When determining the required inspection periods please also consider environmental factors, level of duty and storage.
PROOF LOAD TESTS: It is also recommended that Chain Slings and related assemblies are Proof Load Tested EVERY 12 MONTHS.


Check another product
EVERY 6 MONTHS

According to Australian Standards Chain Slings (G80 or G100) should be visually inspected by a competent person EVERY 6 MONTHS.
This is a guide only. Lifting Equipment should be inspected prior to each use to ensure it has a current inspection tag, has not been recently damage and is safe for use. When determining the required inspection periods please also consider environmental factors, level of duty and storage.
PROOF LOAD TESTS: It is also recommended that Chain Slings and related assemblies are Proof Load Tested EVERY 12 MONTHS.


Check another product
EVERY 3 MONTHS

According to Australian Standards Chain Slings (G80 or G100) should be visually inspected by a competent person EVERY 3 MONTHS.
This is a guide only. Lifting Equipment should be inspected prior to each use to ensure it has a current inspection tag, has not been recently damage and is safe for use. When determining the required inspection periods please also consider environmental factors, level of duty and storage.
PROOF LOAD TESTS: It is also recommended that Chain Slings and related assemblies are Proof Load Tested EVERY 12 MONTHS.


Check another product
MONTHLY

According to Australian Standards Chain Slings (G80 or G100) should be visually inspected by a competent person MONTHLY. This is a guide only. Lifting Equipment should be inspected prior to each use to ensure it has a current inspection tag, has not been recently damage and is safe for use. When determining the required inspection periods please also consider environmental factors, level of duty and storage.
PROOF LOAD TESTS: It is also recommended that Chain Slings and related assemblies are Proof Load Tested EVERY 12 MONTHS.


Check another product
EVERY 6 MONTHS

According to Australian Standards Harnesses should be visually inspected by a competent person EVERY 6 MONTHS. This is a guide only. Harnesses should be inspected prior to each use to ensure it has a current inspection tag, has not been recently damage and is safe for use. When determining the required inspection periods please also consider environmental factors, level of duty and storage.


Check another product
Please contact Ranger on 1300 SLINGS to discuss inspection requirements.


Check another product